Design of the Tees Barrage 

The concrete base of the barrage is 70 m wide, 32 m long, and 5 m thick; it is supported by five concrete piers. In between the piers are four 8 m tall, 50 tonne fish belly plates to control the flow of water, operated by 21 tonne hydraulic rams. The 600 ton road bridge is of a tubular steel arched viaduct design specified at 45 units of HB motorway loading.The bridge has eight welded tubular steel arches each 17.5 m wide with a 5 m rise but only the four central arches actually cross the waters of the river Tees. The arches are sprayed with green chlorinated rubber paint and are sealed against corrosion. Some 16,500 cubic metres of reinforced concrete and 650 tons of structural steel went into the building of the barrage.

On the downstream side of the central pier is a 29 m tower of lights with reflective globes and plates, supported by guy ropes. Illumination is provided by four lights on the concrete barrage base for ease of maintenance.

The barrage has two pavilions, one on the south bank, and a little-used one on the north bank, both extending under the road bridge. The south bank pavilion houses the barrage control room and the offices of the SMi – Stockton Middlesbrough Initiative'. A visitors' center is also planned for the barrage. The barrage has a design life of 120 years. The project also included the regeneration of 100 ha of adjacent derelict land producing riverside walks, parkland and leisure facilities.

bottom of page